Skip to main content

NORTHLAND HOMESHOW SOLAR & HEATPUMP SPECIALS!!

Integrated have some great specials at the Northland Home Show this weekend!!

Come and see us to talk Solar, Heat Pumps, New Builds, and Everything Electrical at McKay Stadium. 29th September - 1 October.

Get in touch if you would like to take advantage of these offers.

*For a limited time.
*Terms and Conditions apply.

Integrated Electrical and Solar – Home Show Special – Terms and Conditions:

Heat pumps: The special price is based on.
– Subject to site visit and sizing calculation
– Simple back-to-back installation (maximum 3m of pipe and capping) on external wall
– Single storey home, outdoor unit on poly base
– Timber framed building with wooden or fibre cement cladding.
– Existing power circuit is having required spare capacity and is up to current standards (no rubber cabling, rewirable fuses, large enough circuit breaker and cable size)
– No suspected asbestos containing materials, any suspected ACM will need to be tested and treated accordingly.
– Installation in Whangarei city boundaries.
– Offer valid until 6th of October, Deposit must be paid by 31st of October to secure the special price.

Solar systems: The special price is based on.
– Subject to site visit and sizing calculation
– Simple single storey installation on a tin roof (maximum pitch 18degrees)
– Your roof is in good condition and ready for solar panels to be installed.
– Single phase electrical installation
– Single array, portrait orientation with single DC string (extra costs for split arrays, landscape orientation)
– No suspected asbestos containing materials, any suspected ACM will need to be tested and treated accordingly.
– A modern switchboard with capacity on the din rail to add the required solar components.
– Readily accessible ceiling space between the roof mounted solar array location and the inverter (Maximum cable distance 15m)
– Inverter to be located adjacent to the switchboard.
– If a Wifi internet connection cannot be made to the inverter additional cabling may be required at an extra cost
– Network approval from Northpower will be required.
– Installation in Whangarei city boundaries.
– Offer valid until 6th of October, Deposit must be paid by 31st of October to secure the special price.